Saturday, November 12, 2011

Water System Construction

Just a heads-up: Construction is underway on a new water pipeline from our water storage tanks above the Clubhouse to the well-head by the Clubhouse bathrooms. This is an 8 foot deep trench running over 300 feet and crossing the parking lot just next to the Clubhouse.

The Clubhouse door between the bathrooms is blocked by this construction, but you can still get into the Clubhouse from the pool deck or the upstairs doors. The pool and hot tub are still open and unaffected by this construction. Water service in the Clubhouse is still coming in via the old (LEAKY!) water pipe.

Most of the parking lot is unaffected.

This trench should be filled later on Saturday, Nov 12, but will probably be a little soft for parking until we get gravel placed over the dig area.

Vehicle access to the golf cart parking area above the clubhouse and to the 6 seasonal trailer sites above the Clubhouse is only via the road above the Adam and Eve bathrooms.

Once digging is done, new water filtration and chlorination systems will be installed in 5 foot by 5 foot sheds by the Clubhouse, at the hairpin turn below the parking area, at the Ponderosa cabin and at the Cedar cabin. There will also be a water system installed in the basement behind the Ranch office.

0 comments:

Post a Comment